Made the coverings for the pantry and guest bedroom from oak plywood. More caulking and priming everywhere.
Spent an hour's worth of back-and-forth talking to Buddy Purcell, owner of Huckins Yachts about the couplings and asked about the manifold bilge system. He said only one was built (for the Navy); a very elaborate system that allows for the engine vacuum to assist in emptying the bilges.
Talked to Bob at Underwater Maintenance to get divers to replace the bolts which hold the zinc plates so this can finally be hooked up correctly to prevent all the corrosion.
Monday, June 4, 2007
Subscribe to:
Post Comments (Atom)
1 comment:
Thanks for writing this.
Post a Comment